What is and Why use the
Energy Management Components
Green levies, tighter operating margins and profits are
a few economic drivers forcing operators to use more
intelligent power management strategies.
Real-time measurements of electrical parameters, such as
voltage variations or distortions, can be transmitted via
networks to operators, warning of breaches in threshold
limits. And, the power quality information improves
on-site efficiency and eases negotiation with utility
companies and energy authorities.
For starters, several utility meters or power analysers
should be located at the service entrance and at strategic
points throughout the site. Data can be transmitted to a
host PC over a serial link. Meanwhile, an energy mana-
gement software improves real-time data from several
networked nodes so to work out a power profile.
Large commercial or industrial electricity consumers
have to deal with fixed energy charges related to the
power demand of one or more sites as well as the charge
per unit of energy consumed. If the business exceeds
the agreed power demand or “installed power” then it
is forced to pay extra costs. To matters worse, utilities
can also impose higher installed power tariffs that can
often represent up to 60% of a commercial consumer’s
total utility charge. So clearly, a small mistake that
leads to a brief excess power demand can cost many
thousands of euro.
Carlo Gavazzi supplies EM systems that provide infor-
mation so that operators can identify consumption
trends and take corrective actions. Analysing the power
profile operators can also aggregate loads and so
negotiate more favourable terms with the utility com-
pany. Real time power consumption monitoring also
allows a site manager to anticipate overloads conditions
that would, for example, trip a circuit breaker.
Alarm thresholds can be set to warn managers if preset
limits are reached, and armed with the adequate
system loading and status information having time to
organise remedial actions.